Kerala PWD Code - I Paper


Kerala PWD Code - I PAPER
Date of Examination :: 20-09-2019

Question1:-PWD code is intended to define the scope of ___________ of the public works department.
        A:-Executive functions
        B:-Administrative functions
        C:-Administrative and executive
        D:-Pension and leave matters
        Correct Answer:- Option-C
Question2:-The specific sanction of ____________ is necessary for the creation of temporary appointments as distinct from work charged
establishment.
        A:-Government
        B:-Chief Engineer
        C:-Assistant Executive Engineer
        D:-Superintending Engineer
        Correct Answer:- Option-A
Question3:-Who is competent to submission of application for allowing guard for the protection of public property?
        A:-Government
        B:-Superintending Engineer
        C:-Chief Engineer
        D:-Executive Engineer
        Correct Answer:- Option-D
Question4:-___________ Department is empowered execute its own works when ever it is desirable to do so.
        A:-Forest department
        B:-Revenue department
        C:-Tourism department
        D:-Health department
        Correct Answer:- Option-A
Question5:-When employees born on the temporary establishment are employed on work of this nature the pay should, for the time being be
charged
        A:-Salary head of the concerned Department
        B:-Contingent expenditure
        C:-Direct to the work expenditure
        D:-None of the above
        Correct Answer:- Option-C
Question6:-The schedule of rates, should be prepared on the basis of
        A:-The rates prevailing in the locality
        B:-Sanctioned estimate rate
        C:-Whole sale rate
        D:-None of the above
        Correct Answer:- Option-A
Question7:-In the cases of works or buildings which are intended to be erected in the neighbour hood of any fort or contonment, the matter should
first instence should be referred
        A:-Govt in the Army Department
        B:-Chief Engineer
        C:-Municipal Secretary
        D:-Local Military works officer
        Correct Answer:- Option-D
Question8:-All lighning conductors and their connections with the earth shall inspected and tested _______ by the public work officer.
        A:-Monthly
        B:-Periodically
        C:-Annually
        D:-Bimonthly
        Correct Answer:- Option-B
Question9:-Ordinary repair estimate of civil station Kalpatta lapse on'
        A:-Last day of the calender year
        B:-31st of August
        C:-Last day of the financial year
        D:-One year after saction
        Correct Answer:- Option-C
Question10:-For the deposit work the design and estimate must be drawn up in consultation with
        A:-District collector
        B:-Chief Engineer
        C:-Authorities administering the fund
        D:-Executive Engineer
        Correct Answer:- Option-C
Question11:-In which form utilised for the preparation of detailed completion report
        A:-KPW 42
        B:-KPW 43
        C:-KPW 20
        D:-KPW 21
        Correct Answer:- Option-A
Question12:-Minor works should be closed
        A:-with in one months after submission of March final account
        B:-One month after actual completion and final payment
        C:-One month after submission completion report
        D:-One month after record of completion report
        Correct Answer:- Option-B
Question13:-Who is the custody of the completion certificate of major works
        A:-Divisional Office
        B:-Sub Divisional Office
        C:-Superintending Engineer
        D:-Chief Engineer
        Correct Answer:- Option-A
Question14:-How many amount is provided for insurancing the Govt building while preparing  the estimates 
        A:-5% of the estimate amount
        B:-10% of the estimate
        C:-1/2% of the estimate
        D:-Insurance of the Govt. building is not required
        Correct Answer:- Option-D
Question15:-From where met the Expenditure of Ist supply of furniture of PWD Rest house
        A:-Contingent fund
        B:-Repair estimate
        C:-Original estimate
        D:-Furniture fund
        Correct Answer:- Option-C
Question16:-O.R. Estimate of canal of Pazhassi project at Kannur will lapse on
        A:-31st of August
        B:-31st of December
        C:-Last day of the financial year
        D:-30th day of September
        Correct Answer:- Option-A
Question17:-Special repair work estimate of Rest House Trivandrum remain current
        A:-Last day of the financial year
        B:-31st of August
        C:-30th day of September
        D:-Till the completion of repair
        Correct Answer:- Option-D
Question18:-Provision for the payment of the municipal taxes on public building should be made
        A:-Contingent fund of the District collector
        B:-Contingent fund of Executive Engineer
        C:-Annual Repair estimate of the building
        D:-None of the above
        Correct Answer:- Option-C
Question19:-Under what circumstances the work will arranged as departmentally?
        A:-No contractors are available
        B:-Works coming under Natural Calamity
        C:-Works coming under VVIP visit
        D:-None of the above
        Correct Answer:- Option-A
Question20:-_________ are responsible that the forms of contract are strictly enforced and that no act is  done tending to nullify or vitate a contract.
        A:-Chief Engineer
        B:-Engineers and their subordinates
        C:-Contractor of the work
        D:-Divisional accountant of the concerned Division
        Correct Answer:- Option-B
Question21:-No tender should be accepted from any person directly or indirectly connected with the
        A:-Agent of the contractor
        B:-Government service
        C:-Local Panchayath members
        D:-None of the above
        Correct Answer:- Option-B
Question22:-In which form utilised for the register of tenders
        A:-KPW 43
        B:-KPW 20
        C:-KPW 21
        D:-KPW 90
        Correct Answer:- Option-D
Question23:-As a rule no tender for the execution of work of any description should be received unless _________?
        A:-Accompanied sufficient EMD
        B:-Accompanied sufficient security deposit
        C:-Accompanied conduct certificate of the contractor
        D:-Accompanied medical certificate contractor
        Correct Answer:- Option-A
Question24:-In cases where tender other than the lowest is accepted, ____________ should be kept of the reason for doing so
        A:-Register of contractor
        B:-Confidential record
        C:-Register of tenders
        D:-None of the above
        Correct Answer:- Option-B
Question25:-Who is the competent authority to the acceptance or rejection of tenders?
        A:-Executive Engineer
        B:-Divisional Accountant
        C:-Superintending Engineer
        D:-Officer to whom the duty is entrusted
        Correct Answer:- Option-D
Question26:-Who is the custodian of the accepted tenders approved by the Executive Engineer or higher authorities
        A:-Executive Engineer
        B:-Superintending Engineer
        C:-Divisional Accountant
        D:-Asst. Executive Engineer
        Correct Answer:- Option-C
Question27:-No authority lower than the officer in charge of __________ can accept any tender or make a contract of public works.
        A:-Asst. Exe. Engineer
        B:-Officer in charge of sub division
        C:-Executive Engineer
        D:-Assistant Engineer
        Correct Answer:- Option-B
Question28:-All land, which is the property of Govt, should ordinary be sold through the _____________?
        A:-Public Work Department
        B:-Revenue Department
        C:-Sales tax/GST Department
        D:-None of the above
        Correct Answer:- Option-B
Question29:-The approval or sanction to an estimate for the work of construction of a building for Sub Registrar Office Kozhikode, unless the work
has been commenced, cease operate after a period of
        A:-One year from the date upon which it was accorded
        B:-Five year from the date upon which it was accorded
        C:-Three year from the date upon which it was accorded
        D:-Ten year from the date upon which it was accorded
        Correct Answer:- Option-B
Question30:-Instructions for the execution of emergency works for draught relief is contained in
        A:-Appendix II of Kerala PWD Code
        B:-Appendix II of Kerala Budget manual
        C:-Appendix II of Kerala Financial Code
        D:-Appendix II of Kerala Treasury Code
        Correct Answer:- Option-A
Question31:-Who is competent authority to take necessary steps for the acquisition and transfer of land required for the NH work in Kasaragod
District
        A:-Revenue Divisional Officer Kasaragod
        B:-District Collector Kasaragod
        C:-Superintending Engineer NH Kozhikode
        D:-Chief Engineer NH Trivandrum
        Correct Answer:- Option-A
Question32:-Who is the custodian of the duplicate key of the cash chest of the Divisional Office?
        A:-Superintending Engineer
        B:-Divisional Accountant of the concerned Division
        C:-Executive Engineer of the concerned Division
        D:-Treasury Officer in the jurisdiction
        Correct Answer:- Option-D
Question33:-Who is competent to deal losses of measurement book?
        A:-Chief Engineer
        B:-Divisional Accountant
        C:-Superintending Engineer
        D:-PWD Secretary
        Correct Answer:- Option-C
Question34:-A Register of check measurements should be maintained in __________showing all check measurements made by Divisional Officer.
        A:-Division
        B:-Section
        C:-Sub Division
        D:-Circle Office
        Correct Answer:- Option-A
Question35:-The irrigation division office Kannur has formed new canal for a length of 5 km for the part of increase of water transport facilities. He
should sent an index record map to __________ to enable the survey of India map upto date.
        A:-District Collector Kannur
        B:-Superintendent of Survey Trivandrum
        C:-Chief Engineer Irrigation Trivandrum
        D:-Survey of India Office Calcutta
        Correct Answer:- Option-D
Question36:-Who is responsible for reporting to the PWD, when mortuaries in this jurisdiction require repairs
        A:-District Collector
        B:-Director of Health service
        C:-Superintendent of the Hospital
        D:-DMO
        Correct Answer:- Option-D
Question37:-Who is competent authority to purchase buildings for functioning District Registrar Office Malappuram?
        A:-District Registrar Malappuram
        B:-Director of Registration Department Trivandrum
        C:-Chief Engineer PWD Trivandrum
        D:-None of the above
        Correct Answer:- Option-D
Question38:-In which form used to record casual labour roll
        A:-KPW 19
        B:-KPW 20
        C:-KPW 17
        D:-KPW 21
        Correct Answer:- Option-B
Question39:-Who is the custodian of register of Muster Roll in Division Office?
        A:-Divisional Accountant
        B:-Junior Superintendent
        C:-Executive Engineer
        D:-Section clerk
        Correct Answer:- Option-A
Question40:-When ever a public building which is not borne on the registers of the P"WD falls vacant, it should be handed over the custody of
________ by the occupying department.
        A:-Revenue Dept
        B:-PWD
        C:-Head of office of the occupying Dept
        D:-None of the above
        Correct Answer:- Option-A
Question41:-Who is competent to remission of municipal tax when ever a govt building is likely to fall vacant
        A:-District Collector
        B:-Executive Engineer
        C:-Chairman of the Municipal Council
        D:-Govt.
        Correct Answer:- Option-C
Question42:-Who is competent to carried out all works inconnection with the sanitary installations and water supply to Govt building
        A:-PWD
        B:-Water Authority
        C:-District Collector
        D:-Health Inspector of the Municipality concerned
        Correct Answer:- Option-A
Question43:-Who is the custodian of the building register of all govt building to Kasaragod District
        A:-District Collector Kasaragod
        B:-Executive Engineer Buildings Divisions, Kasaragod
        C:-Asst. Executive Engineer Building sub division, Kasaragod
        D:-Chief Engineer PWD
        Correct Answer:- Option-B
Question44:-It is duty of the __________ to endeavour to get tenants for public building not immediately required for Govt land.
        A:-Executive Engineer
        B:-District Collector
        C:-Asst. Executive Engineer
        D:-Asst. Engineer
        Correct Answer:- Option-A
Question45:-The Village office Kannur is functioned in a building borne on the register of PWD now shifted to Taluk Office Building Kannur. The
vacant building should be handed over by the occupent
        A:-District collector kannur
        B:-PWD
        C:-Tahsildar kannur
        D:-Revenue Divisional officer Thalessery
        Correct Answer:- Option-B
Question46:-When a govt. building, is occupied partly an office and partly as residence the rent to be paid by the occupant should be calculated
under
        A:-Para 226 of the Kerala PWD Code
        B:-Para 320 of the Kerala Public work A code
        C:-Para 327 of the Kerala Public work A code
        D:-Article 247 of the Travancore financial code and A code
        Correct Answer:- Option-D
Question47:-When ever a building in charge of the PWD is to be disposed of, the proposal shall be forwarded to the Chief Engineer along with
__________ showing the book and assessed value.
        A:-Survey Report
        B:-Detailed estimate
        C:-Completion Report
        D:-None of the above
        Correct Answer:- Option-A
Question48:-Period of retention of acquittance roll for establishment pay and travelling allowance of the Executive Engineer Officer
        A:-10 complete account year
        B:-25 complete accounts year
        C:-35 completely accounts year
        D:-5 complete accounts year
        Correct Answer:- Option-C
Question49:-Period of retention of the correspondance file relating to subjects of Sri Moolam Popular assembly
        A:-5 years
        B:-35 years
        C:-20 years
        D:-10 years
        Correct Answer:- Option-C
Question50:-Period of Retention Register Dewan's requisition and warrants in Chief Engineer Office
        A:-5 year after the last estimate is sent
        B:-20 years after the last estimate is sent
        C:-35 years after the last estimate is sent
        D:-20 complete account year
        Correct Answer:- Option-A
Question51:-____________ an irrigation officer has powers to enter upon private property for purposes of executing emergent works.
        A:-Under section 27 of the Travancore Kochin Irrigation  Act
        B:-Under Section 17 of the Malabar Irrigation Act
        C:-Under Para 316(6) of Kerala PWD code
        D:-None of the above
        Correct Answer:- Option-A
Question52:-Projects for irrigation, navigation embankment and drainage for which capital and revenue accounts are kept are two classes
        A:-Productive and unproductive
        B:-Capital work and revenue
        C:-Original work and repair work
        D:-None of the above
        Correct Answer:- Option-A
Question53:-Cash book or imprest account should be closed
        A:-Yearly
        B:-On the date of Transfer
        C:-Daily
        D:-Weekly
        Correct Answer:- Option-B
Question54:-It is the duty of the ___________ of the PWD to see that the sales of miscelleneous property such as usufructs of trees are made
periodically to the best advantage of the Govt.
        A:-Superintending Engineer
        B:-Asst. Executive Engineer
        C:-Divisional Officer
        D:-Divisional Accountant
        Correct Answer:- Option-C
Question55:-In the case of a divisional or subdivisional charge becoming vacant by the death of the officer in charge _____________ of the Dept.
present should be assume charge.
        A:-Asst. Exe.Engineer
        B:-Asst. Engineer
        C:-Next Senior Officer
        D:-None of the above
        Correct Answer:- Option-C
Question56:-When the construction estimate is closed, a completion report of the project should be submitted to the Govt.with
        A:-24 months
        B:-3 years
        C:-16 months
        D:-12 months
        Correct Answer:- Option-D
Question57:-The amount of security to be deposited shall
        A:-10% of the PAC
        B:-1% of the PAC
        C:-2% of the PAC
        D:-5% of the PAC
        Correct Answer:- Option-D
Question58:-All agreement should be signed in favour of
        A:-Governor of Kerala
        B:-Chief Engineer
        C:-Executive Engineer
        D:-Superintending Engineer
        Correct Answer:- Option-A
Question59:-The earneset money deposit of the unsuccessful tenders will be refunded as soon as possible after
        A:-The completion of work
        B:-Execution of work
        C:-Opening of the tender
        D:-The tenders are dispossed of
        Correct Answer:- Option-D
Question60:-In which form utilised for notice inviting tenders of the work
        A:-Form 83
        B:-KPW form 19
        C:-KPW form 20
        D:-KPW form 21
        Correct Answer:- Option-A
Question61:-Who is competent to appointment of the Assistant Engineer subject to the Kerala Public Service Recruitment rule
        A:-District Officer, KPSC
        B:-Superintending Engineer
        C:-PWD Secretary
        D:-Chief Engineer
        Correct Answer:- Option-D
Question62:-Who is the competent to fix the headquarters of all officers other than division officers
        A:-Superintending Engineer
        B:-PWD Secretary
        C:-Chief Engineer
        D:-None of the above
        Correct Answer:- Option-C
Question63:-_____________ is responsible for all important structural designs and controls the central designing officer.
        A:-Superintending Engineer
        B:-Chief  Engineer
        C:-Chief architect
        D:-Govt.
        Correct Answer:- Option-B
Question64:-The executive unit of the department is the
        A:-Sub Division
        B:-Section
        C:-Division
        D:-None of the above
        Correct Answer:- Option-C
Question65:-__________ is ex-officio the professional adviser of all departments of Govt.
        A:-Superintending Engineer
        B:-Executive Engineer
        C:-Assistant Engineer
        D:-Divisional Accountant
        Correct Answer:- Option-B
Question66:-The functions of Divisional Accountant are described is
        A:-Para 74 to 88 of Kerala PWA Code
        B:-Para 74 to 88 of Kerala PWD Code
        C:-Para 74 to 88 of Kerala Financial Code
        D:-Para 74 to 80 of Treasury Code
        Correct Answer:- Option-A
Question67:-The operation of the Department are divided primarily in two class
        A:-Original works and repair or maintenance
        B:-OR works and special repair work
        C:-Original works and special repair work
        D:-Original works and maintenance work
        Correct Answer:- Option-A
Question68:-Who will provide flags for public building in charge of the PWD
        A:-Asst. Exe. Engineer
        B:-Executive Engineer
        C:-District Collector
        D:-Head of Dept.Concern
        Correct Answer:- Option-B
Question69:-The administration of furniture fund of the official residence of the Governor will be conducted by the
        A:-Executive Engineer special Building Trivandrum
        B:-Military Secretary to the Governor
        C:-Chief Engineer
        D:-PWD secretary
        Correct Answer:- Option-B
Question70:-Who is carried out the electrical work of the Govt.Building
        A:-PWD Electrical Wing
        B:-KSEB
        C:-Contractor of the original work
        D:-None of the above
        Correct Answer:- Option-A
Question71:-Who is responsible to maintain the compound of jail
        A:-Executive Engineer
        B:-Asst.Executive Engineer
        C:-Director General of Prison
        D:-Superintendent of the Jail
        Correct Answer:- Option-D
Question72:-The Muster Roll forms will remain valid
        A:-one year from the issue
        B:-six month from the issue
        C:-during the month for which they are issue
        D:-one month they are issued
        Correct Answer:- Option-C
Question73:-In which form the measurement book
        A:-KPW 20
        B:-KPW 19
        C:-KPW 21
        D:-KPW 18
        Correct Answer:- Option-C
Question74:-Period of retention of Inspection Notes of the Chief Engineer is
        A:-10 years
        B:-20 years
        C:-30 years
        D:-5 years
        Correct Answer:- Option-B
Question75:-Period of retention of indent for Articles on the general store of Chief Engineer Office
        A:-10 years
        B:-20 years
        C:-30 years
        D:-3 years
        Correct Answer:- Option-D
Question76:-______________ should generally supervise and control and correct assessment and realisation of revenue as is assessed or collected in
PWD.
        A:-Assistant Engineer
        B:-Executive Engineer
        C:-Superintending Engineer
        D:-L.A. Tahsildar
        Correct Answer:- Option-C
Question77:-______________ is responsible that accounts of his Division are not allowed to fall in to arrear.
        A:-Divisional Account
        B:-Executive Engineer
        C:-Junior Superintendent
        D:-Senior Superintendent
        Correct Answer:- Option-B
Question78:-Who is competent sanction of LWA for 2months of Ist grade D'man working is Division Office
        A:-Chief Engineer
        B:-Superintending Engineer
        C:-Executive Engineer
        D:-Government
        Correct Answer:- Option-C
Question79:-Who is competent to issue of fitness certificate of the strong room of Sub Treasury prescribed in article 51 of Travancore Treasury
code.
        A:-Asst.Exe.Engineer
        B:-Executive Engineer
        C:-Superintending Engineer
        D:-Director of Treasuries
        Correct Answer:- Option-B
Question80:-Who is competent to issue suspension of a IIIrd grade overseer working in PWD NH section office Kasaragod
        A:-Asst. Exe.Engineer NH Kasaragod
        B:-Superintending Engineer, N.H. Kozhikode
        C:-Chief Engineer NH Trivandrum
        D:-Chief Engineer PWD Administration
        Correct Answer:- Option-D
Question81:-When heavy plant and machinery are lent to private parties or contractors for use on works other than govt. work the rent charged
shall be ____________ more than the rate.
        A:-22%
        B:-10%
        C:-30%
        D:-50%
        Correct Answer:- Option-D
Question82:-Who is competent to issue technical construction of length of a building for Engineer College Kannur costing Rs. 250 crores.
        A:-Chief Engineer
        B:-Superintending Engineer
        C:-PWD Secretary
        D:-None of the above
        Correct Answer:- Option-A
Question83:-No work is to be done on Sundays without the written permission of the
        A:-Asst. Engineer
        B:-Overseer in charge of the work
        C:-Executive Engineer
        D:-Superintending Engineer
        Correct Answer:- Option-C
Question84:-No part of the contract shall be sablet without written permission of the
        A:-Chief Engineer
        B:-Executive Engineer
        C:-Govt. Secretary
        D:-None of the above
        Correct Answer:- Option-B
Question85:-When any criminal prosection is instituted against a public officer in respect anything done in connection with the discharge of his
official functions, the officers concerned should at once inform, through the head of office
        A:-District police officer
        B:-Secretary to Govt.
        C:-District Magistrate
        D:-None of the above
        Correct Answer:- Option-B
Question86:-The contingent vouchers of the Chief Engineers office may be destroyed
        A:-15 complete account year
        B:-4 calender year
        C:-4 complete account year
        D:-15 calender year
        Correct Answer:- Option-C
Question87:-Period of retention of completion report of the Executive Engineer Office
        A:-5 year after completion of the work
        B:-5 complete account year
        C:-15 complete account year
        D:-5 year after the completion report
        Correct Answer:- Option-B
Question88:-Period of retention used imprest cash book of the section
        A:-5 years
        B:-10 years
        C:-15 years
        D:-20 years
        Correct Answer:- Option-D
Question89:-Rules for hiring government pumps to cultivators in emergency are defined in
        A:-Para 337
        B:-Para 243
        C:-Appendix V
        D:-Appendix VIII
        Correct Answer:- Option-D
Question90:-Muster Rolls lost or destroyed can only be written off under order of the
        A:-Executive Engineer
        B:-Asst.Exe. Engineer
        C:-Chief Engineer
        D:-Superintending Engineer
        Correct Answer:- Option-D
Question91:-All surplus stores will be devided in two classes
        A:-Unserviceable and accountable
        B:-Serviceable and dismantled
        C:-Serviceable and Unserviceable
        D:-None of the above
        Correct Answer:- Option-C
Question92:-___________ should deal with all cases of loss of public stores.
        A:-Executive Engineer
        B:-Asst. Executive Engineer
        C:-Chief Engineer
        D:-Superintending Engineer
        Correct Answer:- Option-A
Question93:-Executive Engineers are to have all the stock in their divisions checked at least
        A:-Once in a month
        B:-Once in a year
        C:-Once in a week
        D:-None of the above
        Correct Answer:- Option-B
Question94:-__________ shall fix the head quarters of all officers other than divisional offices.
        A:-Superintending Engineer
        B:-Chief Engineer
        C:-Government
        D:-None of the above
        Correct Answer:- Option-B
Question95:-It will be the duty of the _____________ to see that the budget allotments of the year are fully expended, in so far as is consistent with
general economy.
        A:-Supertendent Engineer
        B:-Finance Officer
        C:-Chief Engineer
        D:-Divisional Accountant
        Correct Answer:- Option-C
Question96:-The entire structure is reconstructed owing the occurance of flood, the work should be treated as
        A:-Special repair work
        B:-Ordinary repair work
        C:-Original work
        D:-Maintenance work
        Correct Answer:- Option-C
Question97:-In the case of materials supplied departmentally the rates allowed to the contractor
        A:-with tender excess
        B:-50% of the tender excess will be allowed
        C:-should not allow any profit on the cost of materials
        D:-none of the above
        Correct Answer:- Option-C
Question98:-Important structural designs should as far as possible, be prepared in the
        A:-Superintending Office
        B:-Assistant Engineer Office
        C:-Executive Engineer Office
        D:-Chief Engineer Office
        Correct Answer:- Option-D
Question99:-Authority empowered to award toll collection rights on toll agreement
        A:-Executive  Engineer
        B:-Assistant Engineer
        C:-Chief Engineer
        D:-Superintending Engineer
        Correct Answer:- Option-D
Question100:-When tools are lost by contractors, or departmental employees, the cost to be recovered including
        A:-Purchase tax
        B:-G.S.T
        C:-Sales tax
        D:-Centage charge
        Correct Answer:- Option-D