25-09-2019 Departmental Test for the Ministerial Staff of KSEBL - Electricity Supply Act – III Paper 2

 FINAL ANSWER KEY 

Paper: Electricity Supply Act - III PAPER 

Date of 

Examination 

25-09-2019 

Question1:-A power plant set up by any association of persons for generating electricity primarily for use of members of such association is known as 

        A:-Independent generating plant 

        B:-Captive generating plant 

        C:-Small generating plant 

        D:-Distributed generating plant 

        Correct Answer:- Option-B 

Question2:-A process that simultaneously produces two or more forms of useful energy including electricity is called         A:-Cogeneration 

        B:-Renewable generation 

        C:-Self-generation 

        D:-Hybrid generation 

        Correct Answer:- Option-A 

Question3:-The high voltage backbone system of inter-connected transmission lines, sub-stations and generating plants         A:-Transmission system 

        B:-Dedicated transmission lines 

        C:-Grid 

        D:-Power system 

        Correct Answer:- Option-C 

Question4:-The electricity system set-up to generate power and distribute electricity in a specified area without connection to the grid is called         A:-Independent system 

        B:-Substation 

        C:-Distribution system 

        D:-Stand alone system 

        Correct Answer:- Option-D 

Question5:-Grid standards means the standards specified by the 

        A:-CERC 

        B:-CEA 

        C:-APTEL 

        D:-CTU 

        Correct Answer:- Option-B 

Question6:-The National electricity policy is prepared by 

        A:-Central government 

        B:-Central electricity regulatory commission 

        C:-Central electricity authority 

        D:-Appellate tribunal 

        Correct Answer:- Option-A 

Question7:-Every person, who has constructed a captive generating plant and maintains and operates such plant, shall have the right to         A:-Open access 

        B:-Trading 

        C:-Franchising 

        D:-Distribution 

        Correct Answer:- Option-A 

Question8:-License is not required for 

        A:-Transmission of electricity 

        B:-Distribution of electricity 

        C:-Generation of electricity

        D:-Trading of electricity 

        Correct Answer:- Option-C 

Question9:-The central transmission utility within _________ after the receipt of the copy of the application for license shall sent its recommendations to the central commission 

        A:-7 days 

        B:-15 days 

        C:-30 days 

        D:-45 days 

        Correct Answer:- Option-C 

Question10:-Unless revoked, a licence shall continue to be in force for a period of 

        A:-5 years 

        B:-10 years 

        C:-20 years 

        D:-25 years 

        Correct Answer:- Option-D 

Question11:-Which of the following is not a reason to suspend the license of a distribution licensee?         A:-Persistently failed to maintain uninterrupted supply 

        B:-Unable to discharge the functions imposed on it 

        C:-Broken the terms and conditions of licence 

        D:-Fail to comply the direction of government 

        Correct Answer:- Option-D 

Question12:-The NLDC is constituted for optimum scheduling and despatch of electricity among 

        A:-RLDCs 

        B:-SLDCs 

        C:-CTUs 

        D:-STUs 

        Correct Answer:- Option-A 

Question13:-The SLDC can be operated by 

        A:-A state Government company 

        B:-An authority constituted by any central Act 

        C:-A corporation established by central Government 

        D:-None of the above 

        Correct Answer:- Option-A 

Question14:-This of the following is not a function of the central transmission utility 

        A:-Planning and co-ordination relating to inter-state transmission system with state transmission utilities         B:-Planning and co-ordination relating to inter-state transmission system with state generating companies         C:-Planning and co-ordination relating to intra-state transmission system with authority 

        D:-Undertake transmission of electricity through inter-state transmission system 

        Correct Answer:- Option-C 

Question15:-If any generating company fails to comply with the directions issued by SLDC, it is liable to pay a penalty not exceeding         A:-Rs. 15 lacs 

        B:-Rs. 20 lacs 

        C:-Rs. 5 lacs 

        D:-Rs. 10 lacs 

        Correct Answer:- Option-C 

Question16:-Any consumer aggrieved by the order of CGRF can approach 

        A:-Ombudsman 

        B:-High court 

        C:-State regulatory commission 

        D:-Distribution licensee 

        Correct Answer:- Option-A

Question17:-The standards of performance of a licensee shall be specified by 

        A:-Appropriate Government 

        B:-Central electricity authority 

        C:-Appropriate commission 

        D:-Licensee 

        Correct Answer:- Option-C 

Question18:-No person other than a licensee shall transmit electricity in any street at a rate exceeding 

        A:-200 W and 110 V 

        B:-220 W and 90 V 

        C:-230 W and 120 V 

        D:-250 W and 100 V 

        Correct Answer:- Option-D 

Question19:-No tariff or part of any tariff may ordinarily be amended more frequently than 

        A:-Once in any financial year 

        B:-Twice in any financial year 

        C:-Once in five years 

        D:-Once in three years 

        Correct Answer:- Option-A 

Question20:-The regulatory commission shall accept/reject a tariff petition within _________ from the date of receipt of the application         A:-120 days 

        B:-90 days 

        C:-60 days 

        D:-30 days 

        Correct Answer:- Option-A 

Question21:-Provisions of Act with the prior approval of 

        A:-Appropriate commission 

        B:-Appropriate government 

        C:-Central electricity authority 

        D:-Ombudsman 

        Correct Answer:- Option-B 

Question22:-The central electricity authority shall consist of not more than __________ full-time members 

        A:-Fourteen 

        B:-Fifteen 

        C:-Eight 

        D:-Twelve 

        Correct Answer:- Option-C 

Question23:-Which of the following is not a function of CEA? 

        A:-Specify safety requirements 

        B:-Specify the technical standards 

        C:-Specify the conditions of meter installations 

        D:-Specify Grid code 

        Correct Answer:- Option-D 

Question24:-The central commission shall consist of 

        A:-Chairperson and two other members 

        B:-Chairperson and three other members 

        C:-Chairperson and four other members 

        D:-Chairperson and five other members 

        Correct Answer:- Option-B 

Question25:-The selection committee shall finalise the selection of the member of central commission within ___________ on which the reference is made to it 

        A:-1 months

        B:-2 months 

        C:-3 months 

        D:-4 months 

        Correct Answer:- Option-C 

Question26:-Which of the following is not a function of central commission? 

        A:-Regulate the tariff of central generating companies 

        B:-Regulate the inter-state transmission of electricity 

        C:-Adjudicate disputes 

        D:-Advice central Government 

        Correct Answer:- Option-D 

Question27:-The selection committee to select a member of SERC shall recommend a panel of         A:-1 name 

        B:-2 names 

        C:-3 names 

        D:-4 names 

        Correct Answer:- Option-B 

Question28:-The chairperson or member of SERC shall not hold office after he has attained the age of         A:-60 years 

        B:-65 years 

        C:-68 years 

        D:-70 years 

        Correct Answer:- Option-B 

Question29:-This is a reason to remove a member from the commission 

        A:-Adjudged an insolvent 

        B:-Convicted of an offence involving moral turpitude 

        C:-Guilty of proved misbehaviour 

        D:-All the above 

        Correct Answer:- Option-D 

Question30:-The state electricity regulatory commission fund shall not be used for meeting         A:-Salary of chairperson and members of the state commission 

        B:-Expenses of the state commission 

        C:-Expenses for purposes authorised by the Act 

        D:-Expenses of the central commission 

        Correct Answer:- Option-D 

Question31:-The central government issue direction to central commission in matters of policy as per         A:-Section 107 

        B:-Section 108 

        C:-Section 109 

        D:-Section 110 

        Correct Answer:- Option-A 

Question32:-Any person aggrieved by the order made by a state Commission can file appeal before         A:-Central electricity authority 

        B:-Central electricity regulatory commission 

        C:-Appellate tribunal for electricity 

        D:-Civil court 

        Correct Answer:- Option-C 

Question33:-This of the following does not come under the purview of unauthorised use of electricity         A:-By any artificial means 

        B:-Through a tampered meter 

        C:-Purpose other than for which the usage of electricity was authorised

        D:-Without changing the ownership of connection 

        Correct Answer:- Option-D 

Question34:-To file an appeal against an order of assessment under section 126, the appellant shall deposit an amount equal to         A:-Full assessed amount 

        B:-Half of the assessed amount 

        C:-One third of the assessed amount 

        D:-One fourth of the assessed amount 

        Correct Answer:- Option-B 

Question35:-The transfer value of any assets transferred shall be determined based on the 

        A:-Revenue potential 

        B:-Market value 

        C:-Fair value 

        D:-Book value 

        Correct Answer:- Option-A 

Question36:-The fine for theft of electricity for the first conviction, where the load abstracted does not exceed 10 kW, is         A:-6 times the financial gain 

        B:-4 times the financial gain 

        C:-3 times the financial gain 

        D:-5 times the financial gain 

        Correct Answer:- Option-C 

Question37:-Whoever, negligently breaks, injures, throws down or damages any material connected with the supply of electricity, shall be punishable with fine which may extend to 

        A:-Rs. 20,000 

        B:-Rs. 10,000 

        C:-Rs. 5,000 

        D:-Rs. 1,000 

        Correct Answer:- Option-B 

Question38:-Compounding rate for Agricultural consumer is 

        A:-Rs. 20,000 per kW 

        B:-Rs. 10,000 per kW 

        C:-Rs. 2,000 per kW 

        D:-Rs. 4,000 per kW 

        Correct Answer:- Option-C 

Question39:-In the case of any conviction in a summary trial, it shall be lawful for a special court to pass a sentence of imprisonment for a term         A:-Not exceeding 5 years 

        B:-Not exceeding 4 years 

        C:-Not exceeding 3 years 

        D:-Not exceeding 2 years 

        Correct Answer:- Option-A 

Question40:-The appropriate government may, be notification, appoint duly qualified persons to be chief electrical inspector or electrical inspectors as per 

        A:-Section 161 

        B:-Section 162 

        C:-Section 163 

        D:-Section 164 

        Correct Answer:- Option-B 

Question41:-The chairperson of the forum of regulators shall be the 

        A:-Chairperson of the central Electricity authority 

        B:-Chairperson of the appellate tribunal for electricity 

        C:-Chairperson of the central commission 

        D:-Chairperson of a state commission

        Correct Answer:- Option-C 

Question42:-Any rule or regulation made under the Act can have effect even if it is inconsistent with any other provisions of the         A:-Consumer protection Act, 1986 

        B:-Atomic energy Act, 1962 

        C:-Railway Act 1989 

        D:-Indian Electricity Act, 1910 

        Correct Answer:- Option-D 

Question43:-An officer designated by the Government of Kerala under the provisions of section 126 of the Act         A:-Assessing officer 

        B:-Authorised officer 

        C:-Electrical inspector 

        D:-Inspecting officer 

        Correct Answer:- Option-A 

Question44:-The connected load installed by the consumer at the time of executing the service connection agreement and recorded in kW/kVA in the schedule to the agreement is the 

        A:-Connected load 

        B:-Contract demand 

        C:-Contracted connected load 

        D:-Contracted load 

        Correct Answer:- Option-C 

Question45:-This of the following is not a power intensive unit 

        A:-HT induction arc furnace 

        B:-EHT calcium carbide manufacturing 

        C:-HT electro chemical processes 

        D:-EHT heating load not exceeding 20% of its total connected load 

        Correct Answer:- Option-D 

Question46:-Supply of electricity given for a specified period is called 

        A:-Temporary supply 

        B:-Temporary extension 

        C:-Protected supply 

        D:-Short term supply 

        Correct Answer:- Option-A 

Question47:-Extra high tension means a voltage of and above __________ under normal conditions 

        A:-11000 Volts 

        B:-22000 Volts 

        C:-33000 Volts 

        D:-66000 Volts 

        Correct Answer:- Option-D 

Question48:-The permissible limit of voltage variation at the point of supply in case of LT is 

        A:-6 percent on lower side 

        B:-9 percent on lower side 

        C:-9 percent on higher side 

        D:-10 percent on higher side 

        Correct Answer:- Option-A 

Question49:-The maximum connected load permissible for LT three phase shall be limited to 

        A:-150 kVA 

        B:-100 kVA 

        C:-75 kVA 

        D:-50 kVA 

        Correct Answer:- Option-B 

Question50:-Consumers shall install a suitable device for earth leakage protection

        A:-If connected load is above 4 kW 

        B:-If connected load is above 5 kW 

        C:-If connected load is above 10 kW 

        D:-Irrespective of the connected load 

        Correct Answer:- Option-D 

Question51:-It shall be obligatory for all consumers to restrict the harmonics dumped by them to the levels stipulated by the         A:-IEEE standard 

        B:-IEE standard 

        C:-IEC standard 

        D:-Indian standard 

        Correct Answer:- Option-A 

Question52:-If the licensee imposes load shedding in exigencies based on the directions issued by the SLDC, the licensee shall submit a report to commission within 

        A:-Two days 

        B:-Three days 

        C:-Five days 

        D:-Seven days 

        Correct Answer:- Option-B 

Question53:-The expenditure for extension of the distribution system for giving new service connection need not be borne by the respective applicant in case of 

        A:-Contract demand of 1 MW 

        B:-High rise building 

        C:-Power intensive units 

        D:-Connection with dedicated feeder 

        Correct Answer:- Option-A 

Question54:-This of the following is not accepted as the proof of identify of an individual 

        A:-Driving licence 

        B:-Ration card 

        C:-PAN card 

        D:-Ownership certificate 

        Correct Answer:- Option-D 

Question55:-The norm for estimating the connected load of a domestic building is 

        A:-600 watts/10 square metre 

        B:-500 watts/10 square metre 

        C:-400 watts/10 square metre 

        D:-300 watts/10 square metre 

        Correct Answer:- Option-B 

Question56:-If the installation of an LT consumer is not ready to receive the supply even after the work of the licensee is completed, then the licensee shall serve a notice directing him to take supply within 

        A:-30 days 

        B:-45 days 

        C:-60 days 

        D:-90 days 

        Correct Answer:- Option-C 

Question57:-A domestic consumer belonging to BPL category shall not be required to provide security deposits so long as his monthly consumption does not exceed 

        A:-Twenty units 

        B:-Thirty units 

        C:-Forty units 

        D:-None of the above 

        Correct Answer:- Option-B 

Question58:-The date of inspection shall be scheduled within __________ five working days from the date of receipt of application form

        A:-Three working days 

        B:-Five working days 

        C:-Seven working days 

        D:-Ten working days 

        Correct Answer:-Question Cancelled 

Question59:-For HT service connections, the licensee shall issue demand note to the applicant within _________ on receipt of application form         A:-Seven days 

        B:-Ten days 

        C:-Fourteen days 

        D:-Thirty days 

        Correct Answer:- Option-D 

Question60:-The time limit prescribed for providing LT connection where extension of line is not required is 

        A:-Ten days 

        B:-Fourteen days 

        C:-Thirty days 

        D:-Forty five days 

        Correct Answer:- Option-C 

Question61:-Temporary connection shall not ordinarily be granted for a period exceeding 

        A:-One month 

        B:-Three months 

        C:-Six months 

        D:-One year 

        Correct Answer:- Option-D 

Question62:-Once the consumer made the remittance, the time limit prescribed for conversion from single phase to three phases is         A:-Thirty days 

        B:-Forty-five days 

        C:-Sixty days 

        D:-Ninety days 

        Correct Answer:- Option-B 

Question63:-The time limit prescribed for completing the shifting of transformer from the date of payment of expenditure         A:-Fifteen days 

        B:-Thirty days 

        C:-Forty days 

        D:-Sixty days 

        Correct Answer:- Option-B 

Question64:-The licensee shall issue a notice to an HT consumer directing him to apply for enhancement of contract demand, if the maximum demand recorded exceeds the contract demand for 

        A:-Two billing cycle 

        B:-Three billing cycle 

        C:-Four billing cycle 

        D:-Five billing cycle 

        Correct Answer:- Option-B 

Question65:-While estimating the total load of a consumer, the loads of the following equipment and apparatus shall be considered         A:-Firefighting equipment 

        B:-Uninterrupted power supply equipment 

        C:-Switch mode power supply system 

        D:-Stand by equipment without change over switch 

        Correct Answer:- Option-D 

Question66:-Who of the following is not a member of Electricity Supply Code Review Panel (ESCRP) 

        A:-Chief electrical inspector 

        B:-Chief executive of the state transmission utility

        C:-Trade union representative 

        D:-Small scale industrial consumer's representative 

        Correct Answer:- Option-C 

Question67:-HVDC means DC voltage above ______________ used for transmission of power 

        A:-100000 Volts 

        B:-90000 Volts 

        C:-76500 volts 

        D:-66000 volts 

        Correct Answer:- Option-A 

Question68:-Linked switch means a switch with all the poles mechanically linked to operate 

        A:-Intermittently 

        B:-Frequently 

        C:-Alternately 

        D:-Simultaneously 

        Correct Answer:- Option-D 

Question69:-The electrical safety officer shall be an electrical engineering degree holder with at least ____________ of experience in operation and maintenance of electrical installations 

        A:-Ten years 

        B:-Seven years 

        C:-Five years 

        D:-Three years 

        Correct Answer:- Option-C 

Question70:-The owner of every installation shall affix a danger notice permanently in a conspicuous position if the voltage         A:-Exceeds 100 V 

        B:-Exceeds 150 V 

        C:-Exceeds 200 V 

        D:-Exceeds 250 V 

        Correct Answer:- Option-D 

Question71:-Every electrical installation already connected to the supply system of a licensee shall be periodically inspected and tested by an authority directed by the state government at intervals not exceeding 

        A:-Six years 

        B:-Three years 

        C:-Ten years 

        D:-Five years 

        Correct Answer:- Option-B 

Question72:-On application of 500 V DC between each live conductor and earth for a period of one minute, the insulation resistance of installation and equipment of voltage not exceeding 650 V shall be at least 

        A:-1 Mega Ohm 

        B:-2 Mega Ohm 

        C:-4 Mega Ohm 

        D:-5 Mega Ohm 

        Correct Answer:- Option-A 

Question73:-Protection against earth fault or leakage shall be required for all generators with rating 

        A:-25 kVA and above 

        B:-50 kVA and above 

        C:-75 kVA and above 

        D:-100 kVA and above 

        Correct Answer:- Option-D 

Question74:-The minimum factor of safety for stay-wires, guard-wires or bearer-wires based on the ultimate tensile strength of the wire shall be         A:-2.0 

        B:-3.0

        C:-3.5 

        D:-2.5 

        Correct Answer:- Option-D 

Question75:-No conductor of an overhead line of voltage not exceeding 650 V erected across any street shall at any part there of be at a height less than 

        A:-5.8 metres 

        B:-6.1 metres 

        C:-5.5 metres 

        D:-6.0 metres 

        Correct Answer:- Option-A 

Question76:-When a 33 kV overhead line passes above or adjacent to any building or part of a building, the vertical clearance above the highest part of the building immediately under such line shall not less than 

        A:-2.5 metres 

        B:-3.7 meters 

        C:-2.0 metres 

        D:-3.0 metres 

        Correct Answer:- Option-B 

Question77:-Where 110 kV and 220 kV overhead lines cross each other, the minimum clearances between lines shall be         A:-3.05 metres 

        B:-4.58 metres 

        C:-5.49 metres 

        D:-7.94 metres 

        Correct Answer:- Option-B 

Question78:-Electricity shall not be transmitted into a mine at a voltage exceeding 

        A:-11000 volts 

        B:-6600 volts 

        C:-3300 volts 

        D:-2200 volts 

        Correct Answer:- Option-A 

Question79:-If the capacitor of a consumer is faulty, KSEBL shall issue notice to the consumer directing him to replace the faulty or unserviceable capacitor within 

        A:-Fifteen days 

        B:-One month 

        C:-Two months 

        D:-Forty five days 

        Correct Answer:- Option-B 

Question80:-Consumers other than those in LT-IV industry and LT-V agriculture category who install specified capacitors shall be eligible for a rebate at the rate of 

        A:-10 percent on fixed charges 

        B:-6 percent on energy charges 

        C:-5 percent on energy charges 

        D:-5 percent on fixed charges 

        Correct Answer:- Option-C 

Question81:-ToD tariff shall be applicable to LT-IV industrial consumers having connected load above 

        A:-5 kW 

        B:-10 kW 

        C:-20 kW 

        D:-25 kW 

        Correct Answer:- Option-C 

Question82:-Low voltage surcharge for LT-IV(A) consumers having connected load/contract demand above 100 kW/kVA and availing supply at LT level 

        A:-Rs. 150/kVA/month

        B:-Rs. 175/kVA/month 

        C:-Rs. 248/kVA/month 

        D:-Rs. 268/kVA/month 

        Correct Answer:- Option-A 

Question83:-The minimum electricity charges payable during the period of disconnection for a single phase domestic consumer is         A:-Rs. 20/ month 

        B:-Rs. 30/month 

        C:-Rs. 50/month 

        D:-Rs. 80/month 

        Correct Answer:- Option-B 

Question84:-The energy charge applicable to LT. V(B) category is 

        A:-Rs. 1.50/kWh 

        B:-Rs. 2.00/kWh 

        C:-Rs. 2.50/kWh 

        D:-Rs. 2.90/kWh 

        Correct Answer:- Option-C 

Question85:-LT VI GENERAL (F) tariff is not applicable to 

        A:-Computer training institutes 

        B:-Cinema studios 

        C:-Insurance companies 

        D:-Press clubs 

        Correct Answer:- Option-D 

Question86:-In campuses where lines and lights are provided by the beneficiary, the energy charge for LT metered supply         A:-3.90 Rs /kWh 

        B:-4.50 Rs /kWh 

        C:-4.90 Rs /kWh 

        D:-5.70 Rs /kWh 

        Correct Answer:- Option-A 

Question87:-For conversion from kVA to kW or vice versa, the average power factor is taken as 

        A:-0.80 

        B:-0.85 

        C:-0.90 

        D:-0.95 

        Correct Answer:- Option-C 

Question88:-When colony supply is availed from the HT supply of the consumer, such supply shall be segregated and metered by means of a sub-meter and the consumption will be charged at 

        A:-10 paise extra per kWh 

        B:-20 paise extra per kWh 

        C:-30 paise extra per kWh 

        D:-40 paise extra per kWh 

        Correct Answer:- Option-B 

Question89:-The monthly demand charge applicable to EHT-General-B category is 

        A:-Rs. 260 / kVA 

        B:-Rs. 290 / kVA 

        C:-Rs. 300 / kVA 

        D:-Rs. 370 / kVA 

        Correct Answer:- Option-D 

Question90:-The power factor incentive applicable to HT and EHT consumers for each 0.01 unit increase in power factor from 0.9 is         A:-0.20 percent of energy charges 

        B:-0.30 percent of energy charges 

        C:-0.50 percent of energy charges

        D:-1.00 percent of energy charges 

        Correct Answer:- Option-C 

Question91:-SOP-14 is prepared by 

        A:-Senior superintendent 

        B:-Meter reader 

        C:-Senior assistant 

        D:-Cashier 

        Correct Answer:- Option-C 

Question92:-Which of the following is not a function of stores? 

        A:-Procurement 

        B:-Receiving 

        C:-Inspection 

        D:-Reporting 

        Correct Answer:- Option-A 

Question93:-A document for recording receipt and inspection of materials received from suppliers         A:-FRN 

        B:-GRN 

        C:-MRCI 

        D:-MASA 

        Correct Answer:- Option-B 

Question94:-Numerical ledger does not give information regarding 

        A:-Material code 

        B:-Material description 

        C:-Date of receipt 

        D:-Standard rate 

        Correct Answer:- Option-D 

Question95:-MAT-16 form is 

        A:-RIST 

        B:-MRCI 

        C:-ISTN 

        D:-FRN 

        Correct Answer:- Option-A 

Question96:-This document is the authority for issue of materials from store         A:-MASA 

        B:-MRCI 

        C:-PSL 

        D:-STN 

        Correct Answer:- Option-B 

Question97:-The document used for manufacturing operation 

        A:-FGRN 

        B:-FGTN 

        C:-GRN 

        D:-ISTN 

        Correct Answer:- Option-A 

Question98:-This is not an objective of SCM 

        A:-Provide uninterrupted flow of materials 

        B:-Minimise inventory investment 

        C:-Maintain and improve quality 

        D:-Avoid unhealthy competition 

        Correct Answer:- Option-D

Question99:-This is not a centrally procured item         A:-Conductor 

        B:-Transformer 

        C:-LT - CT 

        D:-Meter 

        Correct Answer:- Option-C 

Question100:-This shall be kept along with the materials in store         A:-Numerical ledger 

        B:-Priced stores ledger 

        C:-Bin card 

        D:-Material issue register 

        Correct Answer:- Option-C