17-10-2020 Kerala PWD Code - I PAPER

 FINAL ANSWER KEY 

Paper: Kerala PWD Code - I PAPER 

Date of Test 17-10-2020 

Question1:---------- is responsible for all important structural designs and controls of central designing offices. 

        A:-Chief Engineer 

        B:-Chief Architect 

        C:-Superintending Engineer Planning 

        D:-Executive Engineer Planning 

        Correct Answer:- Option-A 

Question2:--------- will be responsible for the engineering features of all designs prepared. 

        A:-Superintending Engineer 

        B:-Personal Assistant 

        C:-Executive Engineer 

        D:-Assistant Engineer 

        Correct Answer:- Option-A 

Question3:-The Executive unit of the Department is ------- 

        A:-Circle office 

        B:-Sub Division office 

        C:-Division office 

        D:-Section office 

        Correct Answer:- Option-C 

Question4:-____________ should immediately report to the Chief Engineering  and the District Collector of the District, any serious loss of immovable property caused by any accident or unsual  occurance. 

        A:-Superintending Engineer 

        B:-Executive Engineer 

        C:-Divisional Accountant 

        D:-Administrative Assistant 

        Correct Answer:- Option-B 

Question5:-No authority lower than the officer is charge of ____________ can accept any tender or make a contract of public works.         A:-Division office 

        B:-Circle Office 

        C:-Sub Division Office 

        D:-Section Office 

        Correct Answer:- Option-C 

Question6:-Consolidated completion report should be prepared in form 

        A:-KPW Form 42 

        B:-KPW Form 20 

        C:-KPW Form 21 

        D:-KPW Form 43 

        Correct Answer:- Option-D 

Question7:-Whose is competent to the initial supply of fire buckets and fire extinguisher? 

        A:-Executive Engineer 

        B:-Assistant Engineer 

        C:-Stationary Department 

        D:-Head of Officers Concerned 

        Correct Answer:- Option-D 

Question8:-Completion certificates of works should ordinarily be retained in 

        A:-Circle Office 

        B:-Division Office 

        C:-Sub Division 

        D:-Section Office 

        Correct Answer:- Option-B 

Question9:-The administration of the furniture fund of the official residence of the Governor is 

        A:-Executive Engineer 

        B:-Senior finance Officer 

        C:-Secretary to Govt 

        D:-Military Secretary 

        Correct Answer:- Option-D 

Question10:-The initial supply of flags, flag staffs, blocks and ropes for building incharge of PWD will be met from         A:-Annual maintenance fund 

        B:-Contingent fund 

        C:-Original works 

        D:-Special repair estimate 

        Correct Answer:- Option-C 

Question11:-The Chief Engineer will be competent to sanction for the disposal of building assessed value of Rs.         A:-Unlimited 

        B:-15 lakhs 

        C:-7 lakhs 

        D:-2 lakhs 

        Correct Answer:- Option-A 

Question12:-The duplicate key of divisional cash chests should be placed in the custody of 

        A:-Division Accountant 

        B:-Superintending Engineer Concerned 

        C:-The Treasury officer in the jurisdiction 

        D:-None of the above 

        Correct Answer:- Option-C 

Question13:-The rules relating to rents of public building and lands will be found 

        A:-Para 279 to 292 of KPW A Code 

        B:-Para 279 to 292 of KPW D Code 

        C:-Para 279 to 292 of Kerala Financial Code 

        D:-Para 279 to 292 of Kerala Account Code 

        Correct Answer:- Option-A 

Question14:-Minor Irrigation works coming under

        A:-Irrigating less than 200 Acres 

        B:-Irrigating less than 150 Acres 

        C:-Irrigating less than 500 Acres 

        D:-Irrigating less than 100 Acres 

        Correct Answer:- Option-A 

Question15:-Originals of Tenders and agreements for execution of works approved by the Executive Engineer of a division or by higher authorities should be kept in the personal custody of the 

        A:-Deputy Executive Engineer of the Division 

        B:-Superintending Engineer 

        C:-Divisional Accountant of the Division 

        D:-Executive Engineer of the Division 

        Correct Answer:- Option-C 

Question16:-No tender should be accepted from any person directly or indirectly connected the 

        A:-Executive Engineer 

        B:-Govt Service 

        C:-Nominee of the Contractor 

        D:-None of the above 

        Correct Answer:- Option-B 

Question17:-An ordinary repair Estimate lapse on ___________ in the case of roads and buildings 

        A:-Last day of the Financial Year 

        B:-Last day of the calendar year 

        C:-30th June 

        D:-30th of September 

        Correct Answer:- Option-A 

Question18:-The approval or sanction to an estimate for any public works other than annual repairs will, unless such work has been commenced, cease to operate after a period of ___________ from the date upon which it was according 

        A:-One year 

        B:-Three year 

        C:-Ten year 

        D:-Five Year 

        Correct Answer:- Option-D 

Question19:-Contingent bill register of the Chief Engineer office may be destroyed 

        A:-35 complete account year 

        B:-10 complete account year 

        C:-6 complete account year 

        D:-3 complete account year 

        Correct Answer:- Option-D 

Question20:-Service Book of the officers may be destroyed 

        A:-35 years 

        B:-10 years 

        C:-20 years 

        D:-destroyed six months after the death 

        Correct Answer:- Option-D 

Question21:-Insurance of Govt. Building are made 

        A:-Not insured Govt. Building 

        B:-United India Insurance 

        C:-State Insurance Department 

        D:-New India Assurance 

        Correct Answer:- Option-A 

Question22:-When an entire structure is reconstructed owing the occurance of earthquake the work should be threated as         A:-Spl repair 

        B:-Ordinary repair 

        C:-Original work 

        D:-Natural calamity work 

        Correct Answer:- Option-C 

Question23:-The shedule of rates should be prepared on the basis of rates 

        A:-Average rate taken through out Kerala 

        B:-Prevailing in the locality 

        C:-Average rate in the country 

        D:-None of the above 

        Correct Answer:- Option-B 

Question24:-All lightening conductors and their connections with the earth shall be inpected tested periodically by the         A:-Electricity Board 

        B:-Public works officers 

        C:-Electrical Inspecterats 

        D:-None of the above 

        Correct Answer:- Option-B 

Question25:-Whose is competent to personal custody of accepted tenders and agreements approved by Executive Engineer or higher authority         A:-Executive Engineer 

        B:-Divisional Accountant 

        C:-Superintending Engineer 

        D:-Junior superintendent 

        Correct Answer:- Option-B 

Question26:-____________ will take necessary steps for the acquisitions and transfer of land 

        A:-Revenue Divisional Officer 

        B:-Executing Engineer Investigation Division 

        C:-Special Tahsildar L.A 

        D:-District Collector 

        Correct Answer:- Option-A 

Question27:-When a Govt building is occupied partly an office and partly as residence the rent to be paid by the occupant should be calculated under 

        A:-Para 247 of PWD Code 

        B:-Article  247 of Travancore Financial Code 

        C:-Para 247 of PWD A Code 

        D:-Article 247 of KFC

        Correct Answer:- Option-B 

Question28:-Muster Rolls lost or destroyed can only be written off under the order of 

        A:-Govt 

        B:-Chief Engineer 

        C:-Superitending Engineer 

        D:-Executive Engineer 

        Correct Answer:- Option-C 

Question29:-The muster Roll froms will remain valid for 

        A:-Financial year for which they are issues 

        B:-Calender year for which they are issues 

        C:-15 days for which they are issues 

        D:-During the month for which they are issues 

        Correct Answer:- Option-D 

Question30:-The Executive Engineer will count the cash in hands of each casheir at least 

        A:-Every day 

        B:-Once in a financial year 

        C:-Once in a month 

        D:-Once in calendar year 

        Correct Answer:- Option-C 

Question31:-When heavy plant and machinery are lent to private parties or contractors for use on works other than Govt. works the rent charged shall be __________ more than the rate prescribed in the rule 

        A:-50% 

        B:-22`1/2`% 

        C:-33`1/3`% 

        D:-20% 

        Correct Answer:- Option-A 

Question32:-Irrigation projects works are classified as two 

        A:-Capital works and Revenue works 

        B:-Original works and maintenance work 

        C:-Repair works and Special Repair works 

        D:-Productive and unproductive works 

        Correct Answer:- Option-D 

Question33:-Completion report of project work should be submitted to Govt with in 

        A:-5 years 

        B:-6 months 

        C:-12 months 

        D:-2 years 

        Correct Answer:- Option-C 

Question34:-No works to be done on Sundays without the written permission of the 

        A:-Overseer in charge of the work 

        B:-Assistant Engineer in charge of the work 

        C:-Asst. Exe. Engineer in charge of the work 

        D:-Executive Engineer in charge of the work 

        Correct Answer:- Option-D 

Question35:-Who is the emergency officer in Irrigation wing? 

        A:-All Executive Engineer and Asst. Engineer 

        B:-All superintending Engineer 

        C:-Chief Engineer 

        D:-Deputy Chief Engineer 

        Correct Answer:- Option-A 

Question36:-Each office shall maintain a permanent register of the records destroyed showing the sanction, date of destruction etc in form         A:-KPW 89 

        B:-KPW 19 

        C:-KPW 20 

        D:-KPW 21 

        Correct Answer:- Option-A 

Question37:-Who is competent to issue the fitness certificate of strong room of Sub treasury and District treasury?         A:-Superintending Engineer 

        B:-Executive Engineer 

        C:-Chief Engineer 

        D:-Asst. Executive Engineer 

        Correct Answer:- Option-B 

Question38:-The operation of the public works Dept. are divided primarily in to two classes 

        A:-Original works and special repairs works 

        B:-Original works and ordinary repair works 

        C:-Original works and Repair or Mtc. work 

        D:-Original work and Mtc. works 

        Correct Answer:- Option-C 

Question39:-Oridinary Repair Estimates for Irrigation works in Kozhikode district lapse on 

        A:-31st of December 

        B:-30th September 

        C:-31st of March 

        D:-31st of August 

        Correct Answer:- Option-D 

Question40:-O.R. Estimate of Civil station building Kasaragod is lapse on 

        A:-31st of December 

        B:-30th of September 

        C:-31st March 

        D:-30th of June 

        Correct Answer:- Option-C 

Question41:-No tender should be accepted from any person directly or indirectly connected with the 

        A:-Government service 

        B:-Medical officer 

        C:-Municipal Chairman

        D:-Panchayath President 

        Correct Answer:- Option-A 

Question42:-Inspection Notes of the Executive Engineer may be destroyed after 

        A:-30 year 

        B:-10 year 

        C:-20 year 

        D:-5 year 

        Correct Answer:- Option-B 

Question43:-The Duties and functions of the Divisional Accountant are described in 

        A:-Para 74 to 88 of KPW A code 

        B:-Para 74 to 88 of Budget Manual 

        C:-Para 74 to 88 of Kerala Financial code 

        D:-Para 74 to 88 of PWD Code 

        Correct Answer:- Option-A 

Question44:-The Expr. incurred on Travelling expense incurred by Police in carrying treasure required by the disbursing officer of Public Works Dept are to be treated as 

        A:-Works expenditure 

        B:-Travelling Expense 

        C:-Contingent Expenditure 

        D:-None of the above 

        Correct Answer:- Option-C 

Question45:-Monitary limit of passing of works bill of the Executive Engineers 

        A:-50 lakhs 

        B:-1 crore 

        C:-25 lakhs 

        D:-without monitary limit 

        Correct Answer:- Option-D 

Question46:-All the tenders received should be registered in a register of tenders in form 

        A:-KPW 42 

        B:-KPW 90 

        C:-KPW 43 

        D:-KPW 19 

        Correct Answer:- Option-B 

Question47:-At the time of transfer of charges _____________ original tenders and agreements handed over and taken over should be made and signed by the relived and reliving Accountants 

        A:-A written statement of 

        B:-Abstract of agreement 

        C:-Details of agreement 

        D:-None of the above 

        Correct Answer:- Option-A 

Question48:-All land, which is the property of Govt, should ordinarily be sold through the 

        A:-Public Works Dept 

        B:-Sale tax Dept. 

        C:-Revenue Dept 

        D:-None of the above 

        Correct Answer:- Option-C 

Question49:-Retention period of Major Works Register is 

        A:-5 years 

        B:-10 years 

        C:-15 years 

        D:-3 years 

        Correct Answer:- Option-A 

Question50:-Works files Division office may be destroyed 

        A:-10 years after the CR is accept 

        B:-15 years after the CR is accepted 

        C:-2 years after the CR is accepted 

        D:-5 years after the CR is accepted 

        Correct Answer:- Option-D 

Question51:-To fecilitate the preparation of estimates for periodical repair to building _______ should kept in the office of each Executive Engineer         A:-Detailed measurement book 

        B:-Minor works register 

        C:-Standard measurement book 

        D:-Typical Estimate 

        Correct Answer:- Option-C 

Question52:-Provision for the payment of municipal or other taxes on  public buildings should be made in the ____________ as the Department is administrative control of the building. 

        A:-Annual Repair Estimate 

        B:-Office contingency 

        C:-O.R. Estimate 

        D:-S.R. Estimate 

        Correct Answer:- Option-A 

Question53:-Who is the competent authority to deal with the losses of M. Book? 

        A:-Executive Engineer 

        B:-Chief Engineer 

        C:-Secretary to Govt. 

        D:-Superintending Engineer 

        Correct Answer:- Option-D 

Question54:-The Sub Divisional Officer check measure works as laid down in Para 

        A:-Para 320 of PWD Code 

        B:-Para 320 of PWD A Code 

        C:-Para 320 of Financial Code 

        D:-Para 320 of Treasury Code 

        Correct Answer:- Option-B 

Question55:-The contractor shall supply at his own cost all plant, tools implements, ladders, cordage required for the proper execution of his work together with

        A:-Fuel charges of the plant 

        B:-Hire charges of the Articles 

        C:-The carriage from the same to and from the work 

        D:-None of the above 

        Correct Answer:- Option-C 

Question56:-When heavy plants and machinery are lent to private parties or contractors for use on works other than Govt works, the rent charged shall be __________ more than the vate. 

        A:-50% 

        B:-22 `1/2`% 

        C:-33 `1/3`% 

        D:-10% 

        Correct Answer:- Option-A 

Question57:-When stock materials are sold to the public or other department an addition of _________ must be made cover the supervision charges.         A:-20% 

        B:-50% 

        C:-10% 

        D:-22 1/2% 

        Correct Answer:- Option-A 

Question58:-Period of Retention of Register of liabilities and court attachment of Executive Engineer office is 

        A:-5 years 

        B:-3 years 

        C:-20 years 

        D:-35 years 

        Correct Answer:- Option-D 

Question59:-__________ is responsible for the detailed assessment of revenue with in the Division. 

        A:-Asst. Exe. Engineer 

        B:-Divisional Accountant 

        C:-Junior Superintendent 

        D:-Executive Engineer 

        Correct Answer:- Option-D 

Question60:-The earnest money deposit of the unsuccessful tenderer will be refunded as soon as possible after the         A:-Work has been completed 

        B:-After executing the Agreement 

        C:-Tenders are dispossed off 

        D:-After issuing selection Notice 

        Correct Answer:- Option-C 

Question61:-Who shall fix the head quarters of all office other than sub divisional office? 

        A:-Superintending Engineer 

        B:-Chief Engineer 

        C:-PWD Secretary 

        D:-Government 

        Correct Answer:- Option-B 

Question62:-Who is competent to sanction LWA for 5 years of a third grade overseen working the section office?         A:-Assistant Engineer 

        B:-Executive Engineer 

        C:-Chief Engineer 

        D:-Govt. 

        Correct Answer:- Option-C 

Question63:-Executive Engineers are to have all the stock in their Divisions checked at least 

        A:-Once a month 

        B:-Once a year 

        C:-End of March 

        D:-End of September 

        Correct Answer:- Option-B 

Question64:-All surplus stores will be devided in to two classes 

        A:-Serviceable and unserviceable 

        B:-Disposable and auctional 

        C:-Departmental materials and serviceable materials 

        D:-None of the above 

        Correct Answer:- Option-A 

Question65:-Executive Engineer should, deal with all cases of loss of public stores, from what ever under 

        A:-Para 173 to 177 PWD code 

        B:-Para 173 to 177 of Budget Mannual 

        C:-Para 173 to 177 of Treasury Code 

        D:-Article 173 to 177 of Travancore Financial Code 

        Correct Answer:- Option-D 

Question66:-Which Form utilised for preparation of survey report of stores 

        A:-KPW 17 

        B:-KPW 20 

        C:-KPW 19 

        D:-KPW 21 

        Correct Answer:- Option-C 

Question67:-For the purpose of fixing at rates of hire charges tools and plant shall be divided in to ___________ classes.         A:-2 classes 

        B:-6 classes 

        C:-4 classes 

        D:-3 classes 

        Correct Answer:- Option-C 

Question68:-If the construction of a new irrigation channel interfaces with existing public right of way the cost of construction and up keep of the bridge shall be met from 

        A:-PWD funds 

        B:-Irrigation funds 

        C:-Contingent fund 

        D:-Capital Revenue 

        Correct Answer:- Option-B

Question69:-Un productive works have been undertaken for the general improvement of the country and financial from         A:-Capital fund 

        B:-PWD fund 

        C:-Irrigation fund 

        D:-General Revenue 

        Correct Answer:- Option-D 

Question70:-Technical sanction power of the Chief Engineer is 

        A:-50 lakhs 

        B:-5 crore 

        C:-10 crore 

        D:-Unlimited 

        Correct Answer:- Option-D 

Question71:-Sanction of the disposal of building for book value of 50 lakhs given by 

        A:-Chief Engineer 

        B:-Suptg. Engineer 

        C:-Executive Engineer 

        D:-Govt. Secretary 

        Correct Answer:- Option-A 

Question72:-Estimates of Spl-Repair works lapse on 

        A:-End of the financial year 

        B:-End of December 

        C:-One year from the date of sanction 

        D:-Till the completion of the repair works 

        Correct Answer:- Option-D 

Question73:-Methods of execution of works are 

        A:-Departmentally, Piece work agreement, Schedule contract 

        B:-Tender, Quotation Negosiation 

        C:-Agreement condition, Tender condition, Deptl. Execution 

        D:-None of the above 

        Correct Answer:- Option-A 

Question74:-Which one of the following is not coming in contract documents? 

        A:-Complete set of drawing showing the general dimension of the proposed work 

        B:-Complete specification of work to be done 

        C:-A set of conditions of contract to be complied with by the persons whose tender is accepted 

        D:-Copy of tender notice in which the tender is notified 

        Correct Answer:- Option-D 

Question75:-__________ are responsible that the terms of contract are strictly enforced and that no act is done tending to nullify or vitiate a contract.         A:-Contractor entrusted the work 

        B:-Agent of the contractor 

        C:-Engineer and their subordinates 

        D:-Labours engaged for completing work 

        Correct Answer:- Option-C 

Question76:-__________% of amount is provided on unforeseen and contingencies while preparing an estimates. 

        A:-10% 

        B:-5% 

        C:-3% 

        D:-1% 

        Correct Answer:- Option-B 

Question77:-The site of every building should, if possible, be definitely settled before 

        A:-Detailed design and estimates are prepared 

        B:-Tendering the work 

        C:-Executing Agreement of the work 

        D:-Issuing Technical Sanction 

        Correct Answer:- Option-A 

Question78:-When any new building is about to be commenced or any alteration, addition or repairs executed to any building, due intimation of such intention must be given 

        A:-District collector 

        B:-Local head of the Department 

        C:-Executive Engineer 

        D:-Chief Engineer 

        Correct Answer:- Option-B 

Question79:-Where important structural alterations are contemplated orders of the ________ should be obtained. 

        A:-Chief Engineer 

        B:-Finance Department 

        C:-Secretary to Govt 

        D:-Original sanctioning authority 

        Correct Answer:- Option-D 

Question80:-To enable the survey of India to keep the map of India upto date in respect of a new Canals, Roads etc, an index map from original surveys should be sent to 

        A:-Survey of India office Trivandrum 

        B:-Superintendent of Survey and Records Trivandrum 

        C:-Survey of India office Culcutta 

        D:-District survey office of the concerned District 

        Correct Answer:- Option-C 

Question81:-Construction and maintenance of mortuaries will be under taken by 

        A:-Director of Health Service 

        B:-Public Works Department 

        C:-DMO of the concerned District 

        D:-District collector 

        Correct Answer:- Option-B 

Question82:-A revised estimate must be sanctioned when the sanctioned estimates is likely to be exceedent by more than         A:-10% 

        B:-5% 

        C:-1% 

        D:-25%

        Correct Answer:- Option-B 

Question83:-Annual repairs and maintenance works should be closed 

        A:-One month after actual completion and final payment 

        B:-Three months after actual completion and final payment 

        C:-Six months after actual completion and final payment 

        D:-One month after submission of March final account 

        Correct Answer:- Option-D 

Question84:-Every public building should be provided with all necessary fixtures by the _________ which should also repair these fixtures periodically         A:-Government 

        B:-District Collector 

        C:-Public works Department 

        D:-Head of Department 

        Correct Answer:- Option-C 

Question85:-The first supply of Rest House furniture, crockery etc should be charged 

        A:-The office contingent fund 

        B:-The estimate of the building 

        C:-The annual Mtc estimate 

        D:-Repair estimate 

        Correct Answer:- Option-B 

Question86:-The Military Secretary to the Governor will furnish to the Audit Officer an annual certificate of verification in respect of Raj Bhavan furniture, on or before 

        A:-31st of July each year 

        B:-31st of December each year 

        C:-31st of March each year 

        D:-30th of September each year 

        Correct Answer:- Option-A 

Question87:-When ever a building is the charge of the PWD is to be disposed of, the proposal shall be forwarded to the Chief Engineer along with a survey report showing the 

        A:-Estimate amount the building 

        B:-Cost of construction of the building 

        C:-Demolishing charge of the building 

        D:-Book value and assessed value 

        Correct Answer:- Option-D 

Question88:-All works and repairs in connection with sanitary installation and water supply to Govt. building should be carried out by         A:-Water Authority 

        B:-Health Department 

        C:-Municipal Authorities 

        D:-PWD 

        Correct Answer:- Option-D 

Question89:-Who is competent to keep a Register of Buildings in charge of the Department with in the circle? 

        A:-Chief Engineer 

        B:-Executive Engineer 

        C:-Superintending Engineer 

        D:-Deputy Supenintending Engineer 

        Correct Answer:- Option-C 

Question90:-Value of Departmental materials issued for the work unaccounted for by the contractor will be recovered from him         A:-As per agreement rate 

        B:-As per market rate 

        C:-Book value + 20% storage charge 

        D:-Book value + 33% storage charge 

        Correct Answer:- Option-C 

Question91:-Period of Retention of agreement register 

        A:-5 years 

        B:-10 years 

        C:-30 years 

        D:-15 years 

        Correct Answer:- Option-B 

Question92:-Period of Retention of Register of land acquisition with land plan 

        A:-10 years 

        B:-to be preserved 

        C:-30 years 

        D:-5 years 

        Correct Answer:- Option-B 

Question93:-Period of retention of Register of Revenue of Sub Division Office 

        A:-To be preserved 

        B:-10 years 

        C:-30 years 

        D:-5 years 

        Correct Answer:- Option-A 

Question94:-Who is the responsible professional advisor of Government in all matters relating to PWD building wing         A:-Chief Engineer Administration 

        B:-Chief Engineer Buildings 

        C:-Deputy Chief Engineer Administration 

        D:-Deputy Chief Engineer Buildings 

        Correct Answer:- Option-B 

Question95:-PWD code is intended to define the scope of the _________ of Public Works Dept. 

        A:-Executive functions 

        B:-Administrative and executive functions of the officers 

        C:-Administrative functions 

        D:-None of the above 

        Correct Answer:- Option-B 

Question96:-__________ has right to seek the advice of the Accountant General in all matters connected with the accounts of the Division.         A:-Divisional Accountant 

        B:-Deputy Executive Engineer 

        C:-Executive Engineer

        D:-Junior Superintendent 

        Correct Answer:- Option-B 

Question97:-It will be the duty of the __________ to see that the budget allotments of the year are fully expended in so far as is consistent with general economy 

        A:-Senior Finance officer 

        B:-Chief Engineer 

        C:-Administrative officer 

        D:-Administrative Assistant 

        Correct Answer:- Option-B 

Question98:-Period of Retention contractors ledger of Executive Engineers office 

        A:-35 complete account year 

        B:-5 complete account year 

        C:-to be preserved 

        D:-6 complete account year 

        Correct Answer:- Option-C 

Question99:-Power of invitation of tender and execution of agreement of the Executive Engineer is 

        A:-50 lakhs 

        B:-1 crore 

        C:-25 lakhs 

        D:-Upto his T.S. Power 

        Correct Answer:- Option-D 

Question100:-Proper up keep of the compound attached to jail is 

        A:-Superintendent of the jail 

        B:-PWD 

        C:-Director General of Prision 

        D:-District Collector 

        Correct Answer:- Option-A