05-09-2019 PWD Manual Test – The Kerala PWD Manual

 FINAL ANSWER KEY 

Paper: The Kerala PWD Manual 

Date of 

Examination 

05-09-2019 

Question1:-Who is in control of the main executive unit of PWD? 

        A:-Chief Engineer 

        B:-Superintending Engineer 

        C:-Executive Engineer 

        D:-Assistant Executive Engineer 

        Correct Answer:- Option-C 

Question2:-The work of PWD is carried out through how many main wings         A:-5 

        B:-3 

        C:-4 

        D:-2 

        Correct Answer:- Option-A 

Question3:-Who controls the Establishment matters in PWD? 

        A:-Administrative Officer 

        B:-Chief Engineer (Administration) 

        C:-Dy. Chief Engineer (Administration) 

        D:-Chief Administrative Officer 

        Correct Answer:- Option-B 

Question4:-Which rank of officer heads the environment cell of PWD?         A:-Executive Engineer 

        B:-Chief Engineer 

        C:-Superintending Engineer 

        D:-Environmental Officer 

        Correct Answer:- Option-A 

Question5:-What is KHRI 

        A:-Kerala Highway Research Institute 

        B:-Kerala High Rise Building Institute 

        C:-Kerala Human Resource Institute 

        D:-Kerala Health Research Institute 

        Correct Answer:- Option-A 

Question6:-Which department is to be consulted for repairs of vehicles and machineries?         A:-PWD 

        B:-Irrigation 

        C:-KSRTC 

        D:-Motor vehicles department 

        Correct Answer:- Option-B 

Question7:-Who Plans, organise and coordinate works based on budget allocations?         A:-Executive Engineer 

        B:-Dy Chief Engineer 

        C:-Finance officer 

        D:-Chief Engineer 

        Correct Answer:- Option-D 

Question8:-Who scrutinize budget estimates and furnish proposals to government?         A:-Chief Engineer 

        B:-Chief Technical Examiner 

        C:-Administrative Officer

        D:-Finance Officer 

        Correct Answer:- Option-A 

Question9:-Who is to test check 10% of value of works beyond the power of Asst Exe Engineer         A:-Chief Engineer 

        B:-Superintending Engineer 

        C:-Executive Engineer 

        D:-Assistant Engineer 

        Correct Answer:- Option-C 

Question10:-Who is in control of a Sub division? 

        A:-Assistant Engineer 

        B:-Assistant Executive Engineer 

        C:-Executive Engineer 

        D:-Superintending Engineer 

        Correct Answer:- Option-B 

Question11:-Who is responsible for making arrangements for maintenance works?         A:-Executive Engineer 

        B:-Asst Exe Engineer 

        C:-Chief Engineer 

        D:-Assistant Engineer 

        Correct Answer:- Option-B 

Question12:-Who is in control of a section? 

        A:-Executive Engineer 

        B:-Chief Engineer 

        C:-Asst Exe Engineer 

        D:-Assistant Engineer 

        Correct Answer:- Option-D 

Question13:-Generally who is responsible for taking and recording measurements?         A:-Contractor 

        B:-Asst Executive Engineer 

        C:-Executive Engineer 

        D:-Assistant Engineer 

        Correct Answer:- Option-D 

Question14:-Who is to prepare detailed drawings on field data as per approved designs?         A:-Assistant Engineer 

        B:-3rd Grade Overseer 

        C:-Executive Engineer 

        D:-Chief Engineer (Designs) 

        Correct Answer:- Option-B 

Question15:-Who monitor's that contractor faithfully observes Gen. Conditions of contract?         A:-Assistant Engineer 

        B:-Assistant Executive Engineer 

        C:-Contractor 

        D:-3rd Grade Overseer 

        Correct Answer:- Option-D 

Question16:-Who is responsible for conducting soil investigation works?         A:-Lab Technician 

        B:-3rd Grade Overseer 

        C:-Asst Engineer 

        D:-Design Engineer 

        Correct Answer:- Option-B

Question17:-What is the duty of a 1st/2nd Grade Draughtsman? 

        A:-Approve contractor's bills 

        B:-Tabulate tenders 

        C:-Design of Bridges 

        D:-Issuing approval's to sub: offices 

        Correct Answer:- Option-B 

Question18:-The finance Branch in a PWD office deals with, ____________. 

        A:-Transfers and Postings 

        B:-Maintaining service books 

        C:-Preparation of Agreements 

        D:-Preparing monthly accounts 

        Correct Answer:- Option-D 

Question19:-Who generally assists the Chief Engineer (Administration) in deputing officers for various training programs?         A:-Executive Engineer (HR) 

        B:-Dy Chief Engineer 

        C:-Administrative Officer 

        D:-Establishment Officer 

        Correct Answer:- Option-A 

Question20:-Who conducts enquiries regarding allegations against any PWD staff? 

        A:-Chief Engineer (Administration) 

        B:-Dy. Chief Engineer (Administration) 

        C:-Dy. Chief Engineer (Vigilance) 

        D:-Chief Technical Examiner 

        Correct Answer:- Option-C 

Question21:-The Electrical Wing of PWD deals with _____________. 

        A:-Asst Engineer Electrical 

        B:-Asst Exe Engineer Electrical 

        C:-Executive Engineer Electrical 

        D:-Suptg. Engineer Electrical 

        Correct Answer:-Question Cancelled 

Question22:-Who is responsible for the implementation of RMMS? 

        A:-Chief Engineer Administration 

        B:-Dy. Chief Engineer R & B 

        C:-Director Designs 

        D:-Executive Engineer (Planning R & B) 

        Correct Answer:- Option-D 

Question23:-Who is responsible for emergency works under roads section? 

        A:-Executive Engineer, Roads 

        B:-Chief Engineer, Roads 

        C:-Asst Engineer, Roads 

        D:-Suptg. Engineer, Roads 

        Correct Answer:- Option-C 

Question24:-Who manages specialized projects? 

        A:-Chief Engineer, Projects 

        B:-Chief Engineer, Roads 

        C:-Chief Engineer, NH 

        D:-Chief Engineer, Administration 

        Correct Answer:- Option-A 

Question25:-Administrative Officer is under direct control of ___________. 

        A:-Chief Engineer, Roads

        B:-Chief Engineer, Administration 

        C:-Chief Engineer, Projects 

        D:-Chief Engineer, Buildings 

        Correct Answer:- Option-B 

Question26:-Whose duty is to maintain the departmental vehicle log books?         A:-Driver 

        B:-Assistant Engineer 

        C:-Administrative officer 

        D:-Mechanical Engineer 

        Correct Answer:- Option-A 

Question27:-Who assists the EE in exercising financial control over the transactions of the Division?         A:-Dy. Executive Engineer 

        B:-Senior superintendent 

        C:-Divisional Accountant 

        D:-Head clerk 

        Correct Answer:- Option-C 

Question28:-Who is in OVERALL control of the HR & Training Cell? 

        A:-Executive Engineer 

        B:-Chief Engineer, Administration 

        C:-Dy. Chief Engineer, Administration 

        D:-HR Manager 

        Correct Answer:- Option-B 

Question29:-The test required to be passed before declaration of probation         A:-PSC recruitment test 

        B:-PWD proficiency test 

        C:-KPWD training exam 

        D:-Departmental test by KPSC 

        Correct Answer:- Option-D 

Question30:-What is the duration of Orientation Training for new recruitees?         A:-2 weeks 

        B:-3 to 6 days 

        C:-1 week 

        D:-2 to 3 days 

        Correct Answer:- Option-A 

Question31:-Who supervises the IT cell? 

        A:-Chief Engineer, Designs 

        B:-Chief IT Engineer 

        C:-Executive Engineer IT 

        D:-Sr Software Engineer 

        Correct Answer:- Option-C 

Question32:-How many categories of works are included in the budget head of R & B?         A:-1 

        B:-2 

        C:-3 

        D:-4 

        Correct Answer:- Option-D 

Question33:-To whom shall original works of NH to be proposed? 

        A:-MoRTH 

        B:-PWD Secretary 

        C:-Office of Prime Minister

        D:-NHAI 

        Correct Answer:- Option-A 

Question34:-Who receives the money collected as Test FEES by KHRI?         A:-Kerala Road Fund Board 

        B:-PWD 

        C:-Finance Department 

        D:-Central Road Research Institute 

        Correct Answer:- Option-A 

Question35:-Which is NOT an external funding agency for PWD works?         A:-NABARD 

        B:-Govt. of India 

        C:-World Bank 

        D:-Asian Development Bank 

        Correct Answer:- Option-B 

Question36:-What is GIS? 

        A:-Geographical Information System 

        B:-Geometrical Information System 

        C:-General Information System 

        D:-Global Information System 

        Correct Answer:- Option-A 

Question37:-Who carries out GPS field survey in PWD? 

        A:-Central GIS unit 

        B:-Local GIS unit 

        C:-Circle Office 

        D:-Department of surveys 

        Correct Answer:- Option-B 

Question38:-Who shall proceed to site in receiving an information of Major Accident?         A:-Chief Engineer 

        B:-Executive Engineer 

        C:-Suptng. Engineer 

        D:-Asst Engineer 

        Correct Answer:- Option-D 

Question39:-Which cell co-ordinates the Road Safety Activities of PWD?         A:-HR Cell 

        B:-Road Safety cell 

        C:-IT cell 

        D:-RMMS cell 

        Correct Answer:- Option-B 

Question40:-How is Road safety Black Spot at which accidents are clustered are identified?         A:-Jn/bend/short length of 300-500 m 

        B:-Location where no lighting 

        C:-Location where the road is black 

        D:-Location painted with black spots 

        Correct Answer:- Option-A 

Question41:-What is the IRC code for Road signs? 

        A:-IRC 67-2001 

        B:-IRC 28-2006 

        C:-IRC 78-2014 

        D:-IRC 112-2011 

        Correct Answer:- Option-A

Question42:-Specification for Road safety works are available in ____________.         A:-PWD Manual 

        B:-PWD Code 

        C:-PRICE software 

        D:-MoRTH specification for Road and Bridges 

        Correct Answer:- Option-D 

Question43:-What is the frequency of inspection by AE buildings for certification of safety?         A:-Once a year 

        B:-Every 3 months 

        C:-Every six months 

        D:-Twice a year 

        Correct Answer:- Option-D 

Question44:-Who has the responsibility of Bridge Safety? 

        A:-Chief Engineer 

        B:-Assistant Engineer 

        C:-Asst Exe Engineer 

        D:-Executive Engineer 

        Correct Answer:- Option-D 

Question45:-Who shall arrange Refugee Camps in Disaster in liaison with district collector?         A:-Chief Engineer 

        B:-Assistant Engineer 

        C:-Asst Exe Engineer 

        D:-Executive Engineer 

        Correct Answer:- Option-D 

Question46:-What kind of pollution occurs due to gas, dust, fumes and odour?         A:-Water pollution 

        B:-Noise pollutions 

        C:-Air pollution 

        D:-Land pollutions 

        Correct Answer:- Option-C 

Question47:-What is act to be followed for environmental aspects? 

        A:-National and State Acts of India`` 

        B:-World Bank Acts 

        C:-International Environmental Act 

        D:-UN Environmental Act 

        Correct Answer:- Option-A 

Question48:-Who is to issue labour Licence for construction? 

        A:-Department of Explosives 

        B:-Department of Labour 

        C:-Department of Environment 

        D:-PWD 

        Correct Answer:- Option-B 

Question49:-What happens when contractor fails to comply standard EMP?         A:-He is black listed 

        B:-Work cancelled at risk and cost 

        C:-He is sent for compulsory training 

        D:-Receives only partial payment 

        Correct Answer:- Option-D 

Question50:-What is the study conducted for social impact of a project?         A:-Env. Impact Assessment

        B:-Social Impact Assessment 

        C:-Construction Impact Assessment 

        D:-Project Impact Assessment 

        Correct Answer:- Option-B 

Question51:-Investigations to be carried out in how many phases 

        A:-2 

        B:-3 

        C:-4 

        D:-5 

        Correct Answer:- Option-A 

Question52:-Who is responsible to conduct preliminary investigation?         A:-Asst Engineer 

        B:-Asst Exe Engineer 

        C:-Executive Engineer 

        D:-Suptg Engineer 

        Correct Answer:- Option-A 

Question53:-What is meant by MSL? 

        A:-Median Safe Level 

        B:-Most Suitable Level 

        C:-Mean Sea Level 

        D:-Minimum Survey Level 

        Correct Answer:- Option-C 

Question54:-Which reference book shall be used for investigation of Road Works?         A:-IRC 58-2002 

        B:-IRC 37-2001 

        C:-IRC : SP : 19-2001 

        D:-IRC 67-2001 

        Correct Answer:- Option-C 

Question55:-Axle Load studies are done in ____________. 

        A:-Soil investigation 

        B:-Building investigation 

        C:-Bridge investigation 

        D:-Road Investigation 

        Correct Answer:- Option-D 

Question56:-Selection of materials for road construction shall be strictly as per ___________.         A:-Local conditions 

        B:-Standard Data Book 

        C:-Old Approved Estimates 

        D:-IRC/MoRTH guide lines 

        Correct Answer:- Option-D 

Question57:-What is the order of construction of shoulder and pavement?         A:-Shoulder and then pavement each layer by layer 

        B:-Pavement and then shoulder each layer by layer 

        C:-Full pavement thickness and then full shoulder thickness 

        D:-Full shoulder thickness and then full pavement thickness 

        Correct Answer:- Option-B 

Question58:-Which document provides the Qualification Criteria for Bids?         A:-PWD Manual 

        B:-PWD code 

        C:-Bid document

        D:-Contractor's Manual 

        Correct Answer:- Option-C 

Question59:-What is NOT a factors in controlling Road Alignment? 

        A:-Traffic 

        B:-Geometric design 

        C:-Economy 

        D:-Axle Load 

        Correct Answer:- Option-D 

Question60:-How many stages are there for Engineering Surveys for Roads?         A:-2 

        B:-4 

        C:-6 

        D:-8 

        Correct Answer:- Option-B 

Question61:-What is required for determination of Road Vertical Profile? 

        A:-Land Availability 

        B:-Financial Sanction 

        C:-Design of Vertical Curves 

        D:-Design of structures 

        Correct Answer:- Option-C 

Question62:-What is NOT a factor in selecting site for Bridge? 

        A:-Scenery 

        B:-High and Stable Banks 

        C:-Width of channel 

        D:-Depth of channel 

        Correct Answer:- Option-A 

Question63:-What is the length of straight stretches of river required U/S and D/S of bridge site?         A:-500 m 

        B:-300 m 

        C:-200 m 

        D:-100 m 

        Correct Answer:- Option-D 

Question64:-What is the objective of sub surface investigation for Bridges?         A:-Determine the depth of water 

        B:-Determine the width of River 

        C:-Determine the Chemistry of water 

        D:-Determine suitability of soil/rock 

        Correct Answer:- Option-D 

Question65:-IS : 4453-1980 shall be referred for _____________. 

        A:-Super structure design of building 

        B:-Site Exploration 

        C:-Foundation design of building 

        D:-Elevation design of building 

        Correct Answer:- Option-B 

Question66:-How many types of estimates are there in PWD? 

        A:-4 

        B:-5 

        C:-3 

        D:-6 

        Correct Answer:- Option-D

Question67:-How many parts are there for a detailed estimate? 

        A:-5 

        B:-6 

        C:-8 

        D:-7 

        Correct Answer:- Option-D 

Question68:-What is the role of State PWD regarding National Highways?         A:-Sourcing funds 

        B:-Issuing NH numbers 

        C:-Agent for Govt. of India 

        D:-Owner for State Govt. 

        Correct Answer:- Option-C 

Question69:-Who accords AS for works on Raj Bhavan? 

        A:-Controller, Governor's Household 

        B:-Comptroller and Auditor General 

        C:-Accountant General 

        D:-Secretary, Finance 

        Correct Answer:- Option-A 

Question70:-What is the percentage charges for plan and estimate for private deposit works?         A:-2% 

        B:-3% 

        C:-2.5% 

        D:-5% 

        Correct Answer:- Option-C 

Question71:-What is the rates for works to be followed by all Govt. Departments?         A:-Market Rates 

        B:-CPWD Rates 

        C:-Kerala PWD Schedule of Rates 

        D:-Own rates for each department 

        Correct Answer:- Option-C 

Question72:-What is the Data to be followed for preparing estimates for roads?         A:-Kerala PWD data 

        B:-MoRTH data 

        C:-Self made data 

        D:-Statistic Dept. Data 

        Correct Answer:- Option-B 

Question73:-Who shall fix the Local Market Rate? 

        A:-Chief Engineer 

        B:-Executive Engineer, Buildings 

        C:-Executive Engineer, Roads 

        D:-Executive Engineer, Designs 

        Correct Answer:- Option-B 

Question74:-Who accords administrative sanction? 

        A:-Chief Engineer Administration 

        B:-Administrative Officer, PWD 

        C:-Executive Engineer 

        D:-Government 

        Correct Answer:- Option-D 

Question75:-What is the third type of sanction required other than AS & TS for works?         A:-Financial Sanction

        B:-Commencement Sanction 

        C:-Feasibility Sanction 

        D:-Viability Sanction 

        Correct Answer:- Option-A 

Question76:-Who is the Highest Registering Authority for contractors? 

        A:-Chief Engineer 

        B:-Suptg. Engineer 

        C:-Executive Engineer 

        D:-Government 

        Correct Answer:- Option-B 

Question77:-What is the limit of Electrical works that can be taken up by A category contractors?         A:-All works 

        B:-Up to 55 lakhs 

        C:-Up to 6 lakhs 

        D:-Up to 15 lakhs 

        Correct Answer:- Option-A 

Question78:-When is Departmental Execution method adopted? 

        A:-At the discretion of CE 

        B:-When there is no contractor 

        C:-When the work complicated technically 

        D:-For convenience 

        Correct Answer:- Option-B 

Question79:-In which contract type the rates are quoted as percentage above or below         A:-Item rate contract 

        B:-Piece work contract 

        C:-Lump sum contract 

        D:-Percentage rate contract 

        Correct Answer:- Option-D 

Question80:-How much minimum land shall be available for Road Construction?         A:-60% 

        B:-100% 

        C:-50% 

        D:-25% 

        Correct Answer:- Option-A 

Question81:-When is Pre qualification bidding procedure followed 

        A:-Works costing more than 5 crore 

        B:-Works costing more than 10 crore 

        C:-Works costing more than 15 crore 

        D:-Works costing more than 50 crore 

        Correct Answer:- Option-A 

Question82:-At what level shall Pre bid meeting to be held for Large works         A:-Chief Engineer's level 

        B:-Govt. level 

        C:-Suptg. Engineer's level 

        D:-Executive Engineer's level 

        Correct Answer:- Option-A 

Question83:-When can negotiations made for tenders? 

        A:-No negotiations after opening 

        B:-When the amount is too high 

        C:-When the amount is too low

        D:-When the registration is not valid 

        Correct Answer:- Option-A 

Question84:-Who has to prepare the Working Drawings? 

        A:-Asst Engineer 

        B:-Asst Executive Engineer 

        C:-Design wing 

        D:-Contractor's site Engineer 

        Correct Answer:- Option-D 

Question85:-What is the maximum limit of payment without detailed scrutiny of bills?         A:-90% 

        B:-50% 

        C:-60% 

        D:-75% 

        Correct Answer:- Option-D 

Question86:-Agreed rate is applicable up to what % of excess of that particular item         A:-10% 

        B:-15% 

        C:-25% 

        D:-50% 

        Correct Answer:- Option-C 

Question87:-Where shall the drawing be maintained? 

        A:-Division office 

        B:-Site office 

        C:-Section office 

        D:-Sub division office 

        Correct Answer:- Option-B 

Question88:-What is the remedy for over excavation? 

        A:-Fill it back with earth 

        B:-No payment for excess earth work 

        C:-Fill up by concrete/Masonry 

        D:-Charge FINE on contractor 

        Correct Answer:- Option-C 

Question89:-What is the minimum time allowed to drain after aggregates are washed for Road Works?         A:-24 Hrs 

        B:-48 Hrs 

        C:-72 Hrs 

        D:-12 Hrs 

        Correct Answer:- Option-C 

Question90:-Normally, how many hours required for removal of shuttering of beam faces?         A:-24 Hrs 

        B:-48 Hrs 

        C:-72 Hrs 

        D:-7 days 

        Correct Answer:- Option-A 

Question91:-What item above 1000 cu.m shall be reported to Chief Technical Examiner?         A:-Aggregates for road works 

        B:-Concrete 

        C:-Earth work 

        D:-Masonry 

        Correct Answer:- Option-C

Question92:-Who normally prepares estimate for electrical works? 

        A:-AE KSEB 

        B:-AE electrical, PWD 

        C:-Any approved electrician 

        D:-Electrical consultants 

        Correct Answer:- Option-B 

Question93:-Type of wiring shall be resorted to as far as possible in electrification works         A:-concealed wiring 

        B:-open wiring 

        C:-piped wiring 

        D:-underground wiring 

        Correct Answer:- Option-B 

Question94:-What is the threshold for technical audit? 

        A:-All maintenance works 

        B:-All original works above 5 crores 

        C:-All maintenance works above 5 crores 

        D:-All original works 

        Correct Answer:- Option-B 

Question95:-Cationic Bitumen Emulsion is advantageous for ___________ road works.         A:-Both New and Maintenance 

        B:-Only maintenance works 

        C:-Only new works 

        D:-Only for BM & BC works 

        Correct Answer:- Option-A 

Question96:-What is the renewal frequency of BM & AC roads? 

        A:-3 years 

        B:-5 years 

        C:-10 years 

        D:-7 years 

        Correct Answer:- Option-D 

Question97:-Where is the register of buildings kept? 

        A:-Section 

        B:-Sub Division 

        C:-Division 

        D:-Circle 

        Correct Answer:- Option-C 

Question98:-What is the periodicity of varnishing and oiling work of govt. buildings?         A:-Once in a year 

        B:-Twice in year 

        C:-Once in two years 

        D:-Once in five years 

        Correct Answer:- Option-C 

Question99:-Who acts as the estate officer of all Govt. Buildings? 

        A:-Chief Engineer Buildings 

        B:-District collector 

        C:-Asst Engineer Buildings 

        D:-Executive Engineer Buildings 

        Correct Answer:- Option-D 

Question100:-What is the basic value on which depreciation is applied during building evaluation?         A:-Market value

        B:-Estimated capital value         C:-Value shown in registration         D:-Value on which tax is paid         Correct Answer:- Option-B